Project Location: D1, NBP Field, Offshore Mumbai, India
Client: Oil and Natural Gas Corporation Limited
Contract signed: August 2011
Contract: Bareboat and Operations & Maintenance
Contract Period: Primary period – 7 years, Extension – 6 years annually
Conversion & Integration work: Keppel Shipyard
A complex turret moored facility involving topside fabrication and life extension works of over 7000 tones
commissioned in record time of 20 months
Commissioned: April 2013
100% uptime with zero LTI (Lost Time Incidence) for over 5.5 years of operations
UWILD: Completed Underwater Inspection in-lieu of Dry Docking
Safety Accolades
International Safety Award with MERIT grade from British Safety Council in 2019 for demonstrating a strong commitment to good health and safety management during 2018
SWORD OF HONOUR the PINNACLE award in Occupational Health Safety and Wellbeing from British Safety Council in 2018
5-STAR RATING from British Safety Council in OCCUPATIONAL HEALTH & SAFETY
International safety award with DISTINCTION grade from British Safety Council in 2018
International Safety Oil & Gas Sector Award from British Safety Council in 2018
Award for Outstanding Bravery to Mooring Master from British Safety Council in 2018
Bravery Award –Environmental Hazard to Marine Superintendent from OSH INDIA in 2018
Project Location: C7, NBP Field, Offshore Mumbai, India
Client: Oil and Natural Gas Corporation Limited
Contract signed: February 2013
Contract: Bareboat and Operations & Maintenance
Contract Period: Primary period – 9 years, Extension – 7 years annually
Conversion & Integration work: Keppel Shipyard
A complex turret moored facility involving complex gas compression requirements and topside fabrication and life extension works of over 7000 tones commissioned in record time of 23 months
Commissioned: February 2015
100% uptime with zero LTI (Lost Time Incidence) for over 3.5 years of operations
UWILD: Completed Underwater Inspection in-lieu of Dry Docking
Safety Accolades
International Safety Award with MERIT grade from British Safety Council in 2019 for demonstrating a strong commitment to good health and safety management during 2018
SWORD OF HONOUR the PINNACLE award in Occupational Health Safety and Wellbeing from British Safety Council in 2018
5-STAR RATING from British Safety Council in OCCUPATIONAL HEALTH & SAFETY International safety award with MERIT grade from British Safety Council in 2018
Bravery Award – Chemical Hazard to Marine AB from OSH INDIA in 2018
Innovation Silver award from OSH-India
Features
Dead Weight - 97,305 tones
Length - 246.78 m
Beam - 42 m
Water Depth - 85 m
Production capacity - 26,500 bopd
Gas Compression - 63.5 mmscfd
Water Injection Capacity - 15,000 bwpd
Storage Capacity - 510,000 bbls
Helideck - Sikorsky S-61N
Accommodation - 77 pax
Mooring & Risers - Internal Turret, 8 risers and umbilical
WORLD'S LARGEST FPSO WITH GAS, OIL & MOLTEN SULPHUR PRODUCTION FACILITY
KARAPAN ARMADA STERLING III
Project Highlights
Project Location: Madura field, Indonesia
Scope: Engineered & Constructed
Constructed: Keppel Shipyard
Contract signed: December 2014
Commissioned: July 2017
Flag: Indonesian
Vessel type: AFRAMAX Double Hull
End Client: HCML (a JV of Husky Oil, Canada and CNOOC, China)
Zero LTI (Lost Time Injury) during construction phase
Safety Accolades
An Indonesian company has operated the FPSO with 99% uptime and with zero LTI during the first year of operation after the facility was successfully commissioned by SPOGL Group